San Leon Energy PLC, Dublin, reported that the Rawicz-15 development well on the 742-sq-km Rawicz concession in Poland’s southern Permian basin was stimulated and flowed at an average rate of more than 3.6 MMscfd over the main flow period of several days.
Source: News